The Earth-Rite FIBC system monitors the resistance of Type C FIBC bags ensuring that the conductive elements of the bag are capable of dissipating static charges in compliance with Cenelec CLC/TR: 50404.
|
The FIBC system can be setup to ensure that operators ground the bag before operations are started. During the bag filling / emptying process the Earth-Rite FIBC system continuously monitors the resistance of the bag so that if it rises above the recommended level of 1 x 108 ohms the process can be halted. |
![]() |
To compensate for normal wear and tear on Type C bags it is important to ensure the bag maintains its capacity to dissipate charge and also ensure the ground connection between the bag and plant earth grounding point is functioning correctly.
Download general brochure Earth-Rite FIBC![]() |
CLC/TR: 50404 states the following in relation to the static hazards associated with powder filling and emptying of FIBCs: “Electrostatic charge can be generated during filling and emptying and it can accumulate on the product as well as on the fabric from which a FIBC is constructed or on any parts of it. An ignition could occur if the accumulated charge is released in the form of an incendive discharge in the presence of a flammable atmosphere. Spark, brush, cone and propagating brush discharges are all possible when FIBC are used “(CLC/TR: 50404). |
